! Environmentally Friendly - Stern Marine Construction Ltd | P.O.Box 7130 Innisfil, Ontario L9S 1A9, serving all Lake Simcoe. Supporting the Lake Simcoe Region Conservation Authority.
Untitled Document

Environmentally Friendly

Stern Marine has always held environmental impact and quality as its first concern in design and construction.

Stern Marine understands that the shoreline area is an important habitat for a variety of aquatic organisms, including fish. Stern Marine makes sure that all of the appropriate sediment and erosion control measures (i.e. silt fences) are in place.

On certain projects, instead of excavating into the soil bank and slope or removing tree roots which would distrub top of bank, driven piles are an option that will reduce or eliminate the amount of soil that must be removed.

 

logo_footer docks dredging barges barge piling marine breakwalls lake simcoe ontario canada

 
Stern Marine Construction Ltd | 1607 Houston Ave., Innisfil, Ontario L9S 4M6
E-mail mj.stern@yahoo.ca | Phone 705. 456.0888 | Cell: (416) 717-2688 | Fax (905) 889.0664

PROUD SUPPORTERS OF: Lake Simcoe Conservation Foundation

 

Website developed & Hosted by Metroland North Media
logo docks dredging barges barge piling marine breakwalls lake simcoe ontario canada